Red-tagged jobs
A red tag or stop-work notice means the building department found a problem. We read the notice, inspect the work and plan the corrections.

Permit problems, handled openly
Dealing with a red tag, expired permit or unpermitted work? SW Florida Builders Group provides red tag permit resolution in Southwest Florida, working with your building department to bring the work into compliance.
A red tag or stop-work notice means the building department found a problem. We read the notice, inspect the work and plan the corrections.
Permits can lapse when work stalls or inspections are missed. We find out what your jurisdiction needs to renew, reactivate or reapply.
Old permits left without a final inspection can surface during a sale or refinance. We help work them toward closure.
Work done without a permit may need an after-the-fact permit, opening up for inspection or correction. Your jurisdiction decides what it will accept.
If the original contractor left, a new contractor can apply to take over the permit. The local building department must approve the change, and it is not automatic.
When inspectors cite structural or code deficiencies, we coordinate an engineer’s evaluation and the corrective work. Hidden work is opened for inspection where required.

A red tag is a notice, often a stop-work order, posted when an inspector finds work that does not match the permit or the code. Permit infirmity is a broader term for deficiencies in the permit itself, such as expiration, an open permit that was never finaled or work that was never permitted. Terms and procedures differ between cities and counties.
The first step is to read the notice and pull the permit record. We want to know what was approved, what was built, which inspections passed and what the department says is wrong. Many problems are fixable, but the path depends on your jurisdiction and we cannot promise a result.
Timing matters because some permits lapse after a set period without a passed inspection, and the rules for reviving them are local. Acting early can keep the options simpler.
When work was built without a permit, jurisdictions commonly ask for an after-the-fact permit. That can include drawings, engineering and fees, and may require opening walls so inspectors can see framing, wiring or plumbing. Some work may need to be corrected. The jurisdiction decides what it accepts.
If the contractor who pulled the permit is gone, a new licensed contractor can ask to become contractor of record. That is a request to the building department, which has its own forms and conditions. We can take that role only if your jurisdiction approves, and we will tell you what we find before you commit.


Illustrative photography of this type of work. These images are not records of specific completed SW Florida Builders Group projects.
A permit is finished when it passes final inspection and the department closes it. Until then, an open permit can follow the property and may complicate a sale or refinance.
We cannot promise a particular outcome, a fee amount or how long a department will take. Reviewers may ask for more information, and some work may not be approvable as built. We can prepare complete submittals, respond to comments, perform corrections and call inspections until final. If repair costs are significant in a mapped flood hazard area, the 50 percent rule may also apply, and your floodplain administrator decides.
| Situation | What the jurisdiction usually asks for | What to settle early |
|---|---|---|
| Red tag or stop-work notice | Correction of cited items and re-inspection | Copy of the notice and the approved plans |
| Expired permit | Renewal, reactivation or a new permit | Last passed inspection and expiration date |
| Open permit | Remaining inspections through final | Which inspections are missing |
| Unpermitted work | After-the-fact permit, drawings and inspection | Whether hidden work must be opened |
| Original contractor gone | Contractor-of-record change request | Owner and prior contractor documents |
Send us the notice, permit number and address. We pull the record and read what the department found.
We compare built work with approved plans and list the deficiencies.
We confirm what it will require, including permits, drawings, engineering or a contractor-of-record request.
We complete the corrective work and call inspections as each item is ready.
We follow the permit to final inspection and closure.
A red tag is a stop-work or violation notice posted when an inspector finds work that does not match the permit or code. What it requires and how to clear it differ by jurisdiction.
We can apply to become contractor of record, but the change needs your local building department’s approval and is not automatic.
Often a jurisdiction offers an after-the-fact permit process, but approval is not guaranteed and some work may need correction.
Your jurisdiction decides whether it can be renewed, reactivated or must be reapplied for. We confirm the process and the inspections that remain.
We serve Southwest Florida and the Tampa Bay region from our Clearwater office. Send us your address and we will confirm.
Send us the address, permit number and a copy of the notice for a site visit and written plan.
SW Florida Builders GroupFlorida Certified General Contractor CGC1532489
ASasA